Document Actions
Enercon-WindStudies (News article)
Analysis of aerogenerators in stationary and dynamic environments to be installed in wind farms
INESC TEC concludes study for the integration of wind park in Portugal
In July 2012, INESC TEC’s Centre for Power and Energy Systems (CPES) concluded a study for the integration of the Alto da Coutada wind park (located between the municipalities of Valpaços and Vila Pouca de Aguiar) in the Portuguese Distribution Grid (Rede Nacional de Transporte – RNT).
The study was ordered by ENERCON GmbH, a well-known manufacturer of wind turbines, which is one of the winning consortia of the public tender for installing 1800 MW of wind parks in Portugal (the Eólicas de Portugal - ENEOP consortium).
The aim of the study conducted by CPES was to demonstrate to the authorities that the wind parks within the ENEOP consortium follow the technical guidelines demanded to the wind parks in the national grid.
CPES has been maintaining a close collaboration with ENERCOM GmbH since 2007. With the conclusion of this study, the power installed totals about 700 MW.